Mindess Building Project

Why We Need a New School

The David Mindess Elementary School was constructed in 1954 as an elementary school and then converted to a high school in 1956. The layout and class sizes are no longer appropriate for elementary students. The school has undergone some renovations, most recently in 1995.  However, the school is not fully ADA compliant. The school has also seen tremendous water intrusion over the years, making parts of the building unusable. In addition, the David Mindess School has seen tremendous growth in population. The school capacity for students is around 590, and currently we have 647 students.

Partnering with the Massachusetts School Building Authority (MSBA) allows us to address all of the Mindess School’s building deficiencies comprehensively at half the cost. If we were to address some of the more significant building issues piecemeal, none of the costs would be reimbursed; the Town would incur all costs associated with becoming ADA compliant, upgrading the electrical system, providing fire suppression systems, replacing the HVAC system, addressing the issue of groundwater permeating the foundation, and, if necessary, housing students in alternative venues while repairs are made.  

Building a new Mindess is the most cost-efficient option, and one that would provide Ashland with a larger school to accommodate its growing student population.

Condition of Current Mindess School

School Cafeteria
Two refrigeration units.
School cafeteria
Two images. The one the left is of the outside of the school and the one on the right is of school doors.
Pump from locker room area.
Internal sump pump
Two images of cracks in ceilings.
Pipes near exit door.
Water damage on ceiling.
Chipping pain over lockers.
Slide12
A small room with several of its walls removed.
School building doors.
Peeling paint
Skylights covered by cloth
A wall dividing one room into two.
Water stains on ceiling.
Slide19
Slide20
Slide21
Slide22
Slide23
Slide24
Slide25
Slide26
Slide27
Slide28
Slide29
Slide30
Slide31
Slide32
Slide33
Slide34
Slide35
Slide36
Slide37
Slide39
Slide40
Slide38
Slide41
Slide43
Slide42
Slide44
Slide45
Slide46
Slide47
Slide48
Slide49
Slide50
Slide51
Slide52
Slide53
Slide54
Slide55
Slide56
Slide57
Slide58
Slide59
Slide60
Slide61
Slide62
Slide63
Slide64
Slide65
Slide66
Slide67
Artist Rendition of the New David Mindess Elementary School